HDB BTO Standard Flat

Designer’s HDB BTO Standard Flat Promotion Package

3-RM 4-RM 5-RM EXC/MAS
$13,280.00 $14,280.00 $15,280.00 $16,280.00

*100% FREE

 

MITSUBISHI STARMAX SYSTEM 3


INVERTER AIRCON


STAINLESS STEEL SINK


CHORME LEVER TAP


FREE Cooker Hood and Hob for
November & December 2019 only!

 

Terms and Conditions Apply

A. CARPENTRY WORKS IN KITCHEN

  • Design & install 10ft top kitchen cabinet (laminated) + ABS
  • Design & install 10ft Bottom kitchen cabinet (laminated) +ABS
  • Supply & install new 2-Tier Stainless Steel Dish drainer-1 set
  • Supply labour to install cooker hob & hood into Kitchen cabinet
  • Supply & install with 1 nos Frosted Glass Panel
  • Supply & install 10ft I Quartz work top.

B. WET WORKS IN KITCHEN

  • Supply & construct base for cabinet, with tiles
  • Supply & construct base for washing machine, with tiles
  • Supply & construct base for Refrigerator, with tiles
  • Supply & construct 1 no shower kerb, with tiles

C. PLUMBING WORKS

  • Supply & install water inlet pipe for sink in kitchen
  • Supply & install water outlet pipe for sink in kitchen
  • Supply & install water outlet pipe for washing machine in kitchen
  • Supply labour to install 2 sets toilets accessories in 2 toilets
  • Supply labour to install 2 nos Mirrors in 2 toilets
  • Supply labour to connect water pipe for 2 sets instant heaters

D. ELECTRICAL WORKS

  • Supply labour to install 10 ceiling light
  • Supply labour to connect 2 instant heaters
  • Supply labour to connect hob in kitchen cabinet
  • Supply labour to connect hood into kitchen cabinet
  • Supply labour to connect door bell at existing points

E. PAINTING WORKS

  • To paint whole house, using ICI or Nippon Walls & Ceiling
  • To paint whole house copper/pvc pipes
  • To paint whole house doors, main door included
  • To paint whole house door frame

F. MISCELLANEOUS ITEMS

  • Supply labour with acid washing whole house
  • Supply labour to clean up whole house windows & grills
  • Supply Corrugated board to protect whole house existing flooring
  • Supply labour to summit HDB application, for all renovation works

G. CEILING WORKS

  • Supply & construct L-box light holder at Living room
  • Supply & construct false ceiling at bedroom’s entrance

H. FOOR WORKS

  • Supply & lay Homogeneous Floor tiles for Living Area
  • Supply & lay Homogeneous Floor tiles for Dining Area
  • Supply & lay Vinyl Flooring for all Bedrooms
  • Supply & lay Homogeneous/Laminate skirting for Living/Dining
    & bedrooms